Shalu Main Campus of Kuang Tien General Hospital Chongde Branch of New Palace International Co., Ltd. Taichung

Stadium and Medical Technology Building, Hungkuang University of Science and Technology

Taichung

1. In order to demonstrate the dynamic curves of the stadium, the elevated large-span design was adopted. 23 m RC beams and 100 cm thick hollow floor slabs were applied. Φ75 cm corrugated ducts jointly formed large-area elevated release energy on floors 2 and 3, with an area of 1454.75 m2. For floor 2, the elevation reached 10.8 meters and 12.6 meters on floor 3. Regional templates and all-area intensive elevated shelf + wood angle supporter; a rather high level of technicality was needed. Secondary are the arc H-shaped steel member large span + color-steel plate rooftop, which show contemporary speed and mechanical aesthetics.
2. Foundation: It was excavated directly to the basement along the steep hillside land along Central Freeway 2. Anchors and retaining columns were needed to form the retaining measure to facilitate excavation.
3. Primary Building Materials: Large corrugated ducts hollow floor plates and exterior walls consisting of tiles and artificial stones; both the construction quality and the exterior were superior.

Name of Project:
Stadium and Medical Technology Building, Hungkuang University of Science and Technology
Floor Area:
6562.41㎡
Started On:
1996-04-14
Completed On:
1997-09-15